Track Protection Project
Construction is Now Complete
The Track Protection Project was completed July 2023.
Project Overview
Metrolink, in coordination with the Orange County Transportation Authority (OCTA), has completed construction of the temporary barrier wall below the Casa Romantica Cultural Center and Gardens. This temporary barrier was constructed to prevent landslide debris from obstructing the rail line.